Should I put water on concrete after it is poured?
March 22, 2022
By: ccreformmelbourneAusr
Comment: 0
The concrete must be maintained moist for 28 days after it is poured. Learn more in Concrete Pool Page! This may be done by spraying the slab as much as possible during the day to keep it totally saturated for the greatest curing results.